Plumbing

Copper water supply lines stubbed below floor.

Pex piping used for heat loops and lateral plumbing.

2 Story plans have supply and waste lines connected to central drop area(s).

Schedule 40 PVC drain, waste, and vent lines.

Shut –off valves on all sinks and water closets.

Single lever mixing vales.

Radon pipe.


Factory Specifications Menu

 

   
   

Protech Modular Homes and Protech System Built Homes
1601 N High St., Wheaton Plaza  Millville, NJ    Phone: 866-571-2555 or 856-293-9100   Fax: 856-293-9103