Plumbing
Copper water supply lines stubbed below floor.
Pex piping used for heat loops and lateral plumbing.
2 Story plans have supply and waste lines connected to central drop
area(s).
Schedule 40 PVC drain, waste, and vent lines.
Shut –off valves on all sinks and water closets.
Single lever mixing vales.
Radon pipe. |